{"id":4207,"date":"2025-01-08T09:15:26","date_gmt":"2025-01-08T09:15:26","guid":{"rendered":"https:\/\/entrepose.gridwise.fr\/?p=4207"},"modified":"2026-03-03T14:05:03","modified_gmt":"2026-03-03T14:05:03","slug":"lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir","status":"publish","type":"post","link":"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/","title":{"rendered":"LNG Canada #Stage 4 \u2013 Modules in place: ready to power the heart of the tank reservoir"},"content":{"rendered":"<p>After lifting the 1,540-ton roof dome, the LNG Canada project reached another key logistical and technical milestone: the installation of the process modules designed to ensure safe, efficient, and continuous LNG storage and sending-out operations. A total of 9 fully pre-assembled units, with unit weights ranking from 100 to 390 tons, have been lifted and set up within millimetric tolerances, 59 meters above ground, on top of the tank. A very high-capacity crane of 1350 metric ton, totalizing 72 trucks for its transportation, was mobilized specifically for these precision lifts, on a site with limited access.<br \/>\nThe safe and smooth installation of these complex structures demonstrated the engagement and expertise of our work crews and front-line supervisors, strengthened by our leading safety culture.<\/p>\n<p><strong>\ud83d\udccdHighly technical lifting operations<\/strong><\/p>\n<p>The modules were installed on the roof of the tank with:<br \/>\n\u2705 Strict adherence to life-critical safety processes and to pre-task risk assessments<br \/>\n\u2705 Meticulous coordination between the logistics, lifting, and mechanical teams<br \/>\n\u2705 Lifting systems designed for the extreme winter conditions<br \/>\n\u2705 Precision execution in a constrained environment <\/p>\n<p><strong>\ud83d\udccdA key milestone before the installation of the cryogenic pumps<\/strong><\/p>\n<p>This essential step prepares for the installation of the in-tank pumps that will enable LNG to flow safely and efficiently.<\/p>\n<p><strong>\ud83d\udce2 Next step:<\/strong> suspended deck erection and insulation &#8211; a key operation to ensure the tank&#8217;s thermal performance.<\/p>\n<p>#LNGCanada #CryogenicTank #EPC  #VINCIConstructionGrandsProjets #EntreposeContracting #EngineeringExcellence#Heavylift#EnergyTransition#entreposeindustries #Mammoet <\/p>\n","protected":false},"excerpt":{"rendered":"<p>After lifting the 1,540-ton roof dome, the LNG Canada project reached another key logistical and technical milestone: the installation of the process modules designed to ensure safe, efficient, and continuous LNG storage and sending-out operations. A total of 9 fully pre-assembled units, with unit weights ranking from 100 to 390 tons, have been lifted and [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":4210,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[108],"tags":[],"class_list":["post-4207","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projet"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>LNG Canada #Stage 4 \u2013 Modules in place: ready to power the heart of the tank reservoir - Entrepose Contracting - Site staging<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"LNG Canada #Stage 4 \u2013 Modules in place: ready to power the heart of the tank reservoir - Entrepose Contracting - Site staging\" \/>\n<meta property=\"og:description\" content=\"After lifting the 1,540-ton roof dome, the LNG Canada project reached another key logistical and technical milestone: the installation of the process modules designed to ensure safe, efficient, and continuous LNG storage and sending-out operations. A total of 9 fully pre-assembled units, with unit weights ranking from 100 to 390 tons, have been lifted and [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/\" \/>\n<meta property=\"og:site_name\" content=\"Entrepose Contracting - Site staging\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-08T09:15:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-03T14:05:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/entrepose.gridwise.fr\/wp-content\/uploads\/2026\/02\/Kittimat_lng_canada-20.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1092\" \/>\n\t<meta property=\"og:image:height\" content=\"741\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"ralzhouri\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"ralzhouri\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/\"},\"author\":{\"name\":\"ralzhouri\",\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/#\/schema\/person\/e0994b1bd13a36c2c01eebaad88def15\"},\"headline\":\"LNG Canada #Stage 4 \u2013 Modules in place: ready to power the heart of the tank reservoir\",\"datePublished\":\"2025-01-08T09:15:26+00:00\",\"dateModified\":\"2026-03-03T14:05:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/\"},\"wordCount\":239,\"publisher\":{\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/entrepose.gridwise.fr\/wp-content\/uploads\/2026\/02\/Kittimat_lng_canada-20.jpg\",\"articleSection\":[\"Projet\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/\",\"url\":\"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/\",\"name\":\"LNG Canada #Stage 4 \u2013 Modules in place: ready to power the heart of the tank reservoir - Entrepose Contracting - Site staging\",\"isPartOf\":{\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/entrepose.gridwise.fr\/wp-content\/uploads\/2026\/02\/Kittimat_lng_canada-20.jpg\",\"datePublished\":\"2025-01-08T09:15:26+00:00\",\"dateModified\":\"2026-03-03T14:05:03+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/#primaryimage\",\"url\":\"https:\/\/entrepose.gridwise.fr\/wp-content\/uploads\/2026\/02\/Kittimat_lng_canada-20.jpg\",\"contentUrl\":\"https:\/\/entrepose.gridwise.fr\/wp-content\/uploads\/2026\/02\/Kittimat_lng_canada-20.jpg\",\"width\":1092,\"height\":741,\"caption\":\"Aerial view of a large circular concrete storage tank under construction in a snow-covered industrial site, with cranes, scaffolding, and equipment around the structure and forested landscape in the background\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/entrepose.gridwise.fr\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"LNG Canada #Stage 4 \u2013 Modules in place: ready to power the heart of the tank reservoir\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/#website\",\"url\":\"https:\/\/entrepose.gridwise.fr\/en\/\",\"name\":\"Entrepose Contracting - Site staging\",\"description\":\"Construire aujourd&#039;hui les infrastructure de demain\",\"publisher\":{\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/entrepose.gridwise.fr\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/#organization\",\"name\":\"Entrepose Contracting - Site staging\",\"url\":\"https:\/\/entrepose.gridwise.fr\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/entrepose.gridwise.fr\/wp-content\/uploads\/2025\/12\/Groupe-425@2x.png\",\"contentUrl\":\"https:\/\/entrepose.gridwise.fr\/wp-content\/uploads\/2025\/12\/Groupe-425@2x.png\",\"width\":616,\"height\":108,\"caption\":\"Entrepose Contracting - Site staging\"},\"image\":{\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/entrepose.gridwise.fr\/en\/#\/schema\/person\/e0994b1bd13a36c2c01eebaad88def15\",\"name\":\"ralzhouri\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/54ef2341bf11424ee2054877d97bd265deef2f114d226f62352b5aa38dc77f27?s=96&d=blank&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/54ef2341bf11424ee2054877d97bd265deef2f114d226f62352b5aa38dc77f27?s=96&d=blank&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/54ef2341bf11424ee2054877d97bd265deef2f114d226f62352b5aa38dc77f27?s=96&d=blank&r=g\",\"caption\":\"ralzhouri\"},\"url\":\"https:\/\/entrepose.gridwise.fr\/en\/author\/ralzhouri\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"LNG Canada #Stage 4 \u2013 Modules in place: ready to power the heart of the tank reservoir - Entrepose Contracting - Site staging","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"LNG Canada #Stage 4 \u2013 Modules in place: ready to power the heart of the tank reservoir - Entrepose Contracting - Site staging","og_description":"After lifting the 1,540-ton roof dome, the LNG Canada project reached another key logistical and technical milestone: the installation of the process modules designed to ensure safe, efficient, and continuous LNG storage and sending-out operations. A total of 9 fully pre-assembled units, with unit weights ranking from 100 to 390 tons, have been lifted and [&hellip;]","og_url":"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/","og_site_name":"Entrepose Contracting - Site staging","article_published_time":"2025-01-08T09:15:26+00:00","article_modified_time":"2026-03-03T14:05:03+00:00","og_image":[{"width":1092,"height":741,"url":"https:\/\/entrepose.gridwise.fr\/wp-content\/uploads\/2026\/02\/Kittimat_lng_canada-20.jpg","type":"image\/jpeg"}],"author":"ralzhouri","twitter_card":"summary_large_image","twitter_misc":{"Written by":"ralzhouri","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/#article","isPartOf":{"@id":"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/"},"author":{"name":"ralzhouri","@id":"https:\/\/entrepose.gridwise.fr\/en\/#\/schema\/person\/e0994b1bd13a36c2c01eebaad88def15"},"headline":"LNG Canada #Stage 4 \u2013 Modules in place: ready to power the heart of the tank reservoir","datePublished":"2025-01-08T09:15:26+00:00","dateModified":"2026-03-03T14:05:03+00:00","mainEntityOfPage":{"@id":"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/"},"wordCount":239,"publisher":{"@id":"https:\/\/entrepose.gridwise.fr\/en\/#organization"},"image":{"@id":"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/#primaryimage"},"thumbnailUrl":"https:\/\/entrepose.gridwise.fr\/wp-content\/uploads\/2026\/02\/Kittimat_lng_canada-20.jpg","articleSection":["Projet"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/","url":"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/","name":"LNG Canada #Stage 4 \u2013 Modules in place: ready to power the heart of the tank reservoir - Entrepose Contracting - Site staging","isPartOf":{"@id":"https:\/\/entrepose.gridwise.fr\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/#primaryimage"},"image":{"@id":"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/#primaryimage"},"thumbnailUrl":"https:\/\/entrepose.gridwise.fr\/wp-content\/uploads\/2026\/02\/Kittimat_lng_canada-20.jpg","datePublished":"2025-01-08T09:15:26+00:00","dateModified":"2026-03-03T14:05:03+00:00","breadcrumb":{"@id":"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/#primaryimage","url":"https:\/\/entrepose.gridwise.fr\/wp-content\/uploads\/2026\/02\/Kittimat_lng_canada-20.jpg","contentUrl":"https:\/\/entrepose.gridwise.fr\/wp-content\/uploads\/2026\/02\/Kittimat_lng_canada-20.jpg","width":1092,"height":741,"caption":"Aerial view of a large circular concrete storage tank under construction in a snow-covered industrial site, with cranes, scaffolding, and equipment around the structure and forested landscape in the background"},{"@type":"BreadcrumbList","@id":"https:\/\/entrepose.gridwise.fr\/en\/lng-canada-stage-4-modules-in-place-ready-to-power-the-heart-of-the-tank-reservoir\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/entrepose.gridwise.fr\/en\/"},{"@type":"ListItem","position":2,"name":"LNG Canada #Stage 4 \u2013 Modules in place: ready to power the heart of the tank reservoir"}]},{"@type":"WebSite","@id":"https:\/\/entrepose.gridwise.fr\/en\/#website","url":"https:\/\/entrepose.gridwise.fr\/en\/","name":"Entrepose Contracting - Site staging","description":"Construire aujourd&#039;hui les infrastructure de demain","publisher":{"@id":"https:\/\/entrepose.gridwise.fr\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/entrepose.gridwise.fr\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/entrepose.gridwise.fr\/en\/#organization","name":"Entrepose Contracting - Site staging","url":"https:\/\/entrepose.gridwise.fr\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/entrepose.gridwise.fr\/en\/#\/schema\/logo\/image\/","url":"https:\/\/entrepose.gridwise.fr\/wp-content\/uploads\/2025\/12\/Groupe-425@2x.png","contentUrl":"https:\/\/entrepose.gridwise.fr\/wp-content\/uploads\/2025\/12\/Groupe-425@2x.png","width":616,"height":108,"caption":"Entrepose Contracting - Site staging"},"image":{"@id":"https:\/\/entrepose.gridwise.fr\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/entrepose.gridwise.fr\/en\/#\/schema\/person\/e0994b1bd13a36c2c01eebaad88def15","name":"ralzhouri","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/54ef2341bf11424ee2054877d97bd265deef2f114d226f62352b5aa38dc77f27?s=96&d=blank&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/54ef2341bf11424ee2054877d97bd265deef2f114d226f62352b5aa38dc77f27?s=96&d=blank&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/54ef2341bf11424ee2054877d97bd265deef2f114d226f62352b5aa38dc77f27?s=96&d=blank&r=g","caption":"ralzhouri"},"url":"https:\/\/entrepose.gridwise.fr\/en\/author\/ralzhouri\/"}]}},"_links":{"self":[{"href":"https:\/\/entrepose.gridwise.fr\/en\/wp-json\/wp\/v2\/posts\/4207","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/entrepose.gridwise.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/entrepose.gridwise.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/entrepose.gridwise.fr\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/entrepose.gridwise.fr\/en\/wp-json\/wp\/v2\/comments?post=4207"}],"version-history":[{"count":1,"href":"https:\/\/entrepose.gridwise.fr\/en\/wp-json\/wp\/v2\/posts\/4207\/revisions"}],"predecessor-version":[{"id":7568,"href":"https:\/\/entrepose.gridwise.fr\/en\/wp-json\/wp\/v2\/posts\/4207\/revisions\/7568"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/entrepose.gridwise.fr\/en\/wp-json\/wp\/v2\/media\/4210"}],"wp:attachment":[{"href":"https:\/\/entrepose.gridwise.fr\/en\/wp-json\/wp\/v2\/media?parent=4207"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/entrepose.gridwise.fr\/en\/wp-json\/wp\/v2\/categories?post=4207"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/entrepose.gridwise.fr\/en\/wp-json\/wp\/v2\/tags?post=4207"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}